Fisher Hamilton Reynosa, Tamp.
- Stainless-steel pre-treatment tunnel, rising MIG welding, leak test for penetrating liquids.
- Installation of 450 tons of structural steel for service platforms, walkers and conveyor support.
- Curing oven installation 6" modular insulated panels,4 combustion chambers, gas trains, chimneys and 25 tons of aluminized recirculation ducts.
- Installation of drying oven modular insulated panels of 6 ", 2 combustion chamber, gas trains, chimneys and 12 tons of aluminized recirculation ducts.
- Installation of PVC pipes, CPVC, and carbon steel for water, RO water, natural gas and compressed air.
- Installation of pumps, agitators, heat exchangers, chillers, instrumentation, Reverse Osmosis unit.
- 2 application booths for powder painting, air conditioning units and galvanized ducts for air conduction.
- Fabrication and installation of modular galvanized tunnel tunnels, 100% bolted.
- Installation of monorail conveyor X458.