Fisher Hamilton Reynosa, Tamp.

  • Stainless-steel pre-treatment tunnel, rising MIG welding, leak test for penetrating liquids.
  • Installation of 450 tons of structural steel for service platforms, walkers and conveyor support.
  • Curing oven installation 6" modular insulated panels,4 combustion chambers, gas trains, chimneys and 25 tons of aluminized recirculation ducts.
  • Installation of drying oven modular insulated panels of 6 ", 2 combustion chamber, gas trains, chimneys and 12 tons of aluminized recirculation ducts.
  • Installation of PVC pipes, CPVC, and carbon steel for water, RO water, natural gas and compressed air.
  • Installation of pumps, agitators, heat exchangers, chillers, instrumentation, Reverse Osmosis unit.
  • 2 application booths for powder painting, air conditioning units and galvanized ducts for air conduction.
  • Fabrication and installation of modular galvanized tunnel tunnels, 100% bolted.
  • Installation of monorail conveyor X458.